What are the typical lead times for large-scale infrastructure orders?
Short answer Lead times depend on order volume and customization, but in-house manufacturing removes many supply-chain bottlenecks. A typical AIDC project runs approximately 9 months from assessment to energization, with factory pre-integration and site work running in parallel. ~9 months assessment to energization Transparent, phased delivery schedule Factory and site work run in parallel Schedule aligned to your site readiness Typical AIDC deployment schedule PhaseTypical duration Assessment & planning4–6 weeks Factory pre-integration11–15 weeks Logistics & site delivery4–8 weeks On-site commissioning5–7 weeks Upgrade & scalingOngoing Why the schedule holds Standardized units leave the factory complete, ready for transport by sea, road or rail. In-house manufacturing. Core infrastructure is built in the company's own facility, avoiding integrator supply-chain queues. Parallel workstreams. Modules are being built and tested while the site's electrical and civil work proceeds. Standardized logistics. ISO 40HQ modules move by sea, road or rail without special transport engineering. Commissioning, not assembly. On-site time is spent connecting and energizing a factory-validated system. Units in position and ready for commissioning. Finished module staged for delivery. What moves the numbers Quoted per project. Order volume and the level of customization both shift lead times, and the phased delivery schedule is aligned to when your site's electrical and civil preparation will actually be ready. Related questions Does CoolSpace manufacture its own cooling infrastructure? How does CoolSpace support multi-megawatt infrastructure scaling? Days required from arrival to full commissioning? Need a schedule mapped to your site timeline? Talk to a CoolSpace engineer