Warranty periods for CDU and key components?

Short answer Core electrical components and water pumps carry a standard 1-year warranty. Extended warranty options covering the CDU, switches and other critical parts are available on request. 1-year standard warranty Covers core electrical components Covers water pumps Extended options on request Warranty at a glance CoverageTermExtension Core electrical components1 year standardExtendable on request Water pumps1 year standardExtendable on request CDU, switches and other critical partsBy extended warranty optionAvailable on request Why failures are rare enough to warranty this way Components are validated in the factory before they ever start their warranty clock. Industrial-grade components as standard. The parts inside are specified for 24/7 continuous duty. Redundancy absorbs single failures. N+1 pump design means a component fault rarely becomes downtime. Factory testing de-risks the first year. Full-system thermal validation happens before shipment. Where systems are built and tested. The pump coverage referenced in the warranty. Ask for the extension before delivery Extended warranty options are quoted on request. If your operating model needs multi-year coverage on the CDU, switches or critical parts, lock it in during the order rather than after. Related questions What are the routine maintenance requirements for the SR40 V3? Standard ACB/contactor brands and upgrade options? Standard commissioning workflow and labor needs? Need warranty terms for your contract? Talk to a CoolSpace engineer

Daily manual maintenance and key inspection items?

Short answer No daily on-site manual intervention is required — management runs on backend data monitoring. A monthly visual inspection is recommended, covering filter pressure differentials, quick coupling integrity and dry cooler fin cleanliness. Daily: backend monitoring only Monthly: visual inspection Check filter differentials Check coupling integrity The recommended monthly inspection list ItemWhat to look for Filter pressure differentialsRising differential indicates a filter approaching service. Quick coupling integritySigns of seepage or mechanical wear at the fittings. Dry cooler fin cleanlinessDust or debris loading that would choke heat rejection. Why daily labor is near zero The platform watches the system so the site does not have to walk it daily. Monitoring replaces walk-arounds. Temperatures, flow, pressure and alarms are visible remotely. Alarms come to you. Millisecond-level fault alerts remove the need to discover problems by inspection. Monthly is enough for the physical checks. The three inspection items are the ones data cannot fully see. Coupling integrity is a monthly visual item. Fin cleanliness directly affects heat rejection. Related questions Standard commissioning workflow and labor needs? What are the routine maintenance requirements for the SR40 V3? Instant alarms for pump, sensor, or humidity risks? Building your O&M plan? Talk to a CoolSpace engineer

Standard commissioning workflow and labor needs?

Short answer The standard workflow is fluid filling, air venting, flushing and pressure balancing, followed by electrical debugging and load testing. Typically two technicians complete full-load commissioning of a single system within 1–2 days. Fill, vent, flush, balance Electrical debugging and load testing 2 technicians is typical 1–2 days per system, full load The commissioning sequence Fluid filling — loops are filled with the specified coolant. Air venting — trapped air is purged from the loops. Flushing — the loop is flushed to remove fabrication debris. Pressure balancing — branch circuits are balanced and verified. Electrical debugging — distribution, controls and interlocks are checked. Load testing — the system runs at full load and is validated against spec. Why commissioning is short On-site time is spent commissioning — not assembling — a factory-validated system. The hard work happened in the factory. Units arrive pre-integrated and thermally tested. Two technicians is the norm. The workflow is deliberately compact. Days, not weeks. A standard container reaches full-load commissioning in 1–2 days. Validation before the unit ever leaves the building. The circuits the commissioning sequence walks through. Related questions Days required from arrival to full commissioning? Daily manual maintenance and key inspection items? What site preparation is required to deploy the SR40 V3? Scheduling a commissioning window? Talk to a CoolSpace engineer