Impact of outages and automatic restart logic?
- Share
- Issue Time
- Apr 20,2026
Short answer
Sudden outages are handled by an automated recovery sequence. When power returns, the system first re-establishes water circulation; only once pressure and flow meet specification are the mining units brought back online — with no manual intervention required.
- Automated recovery sequence
- Circulation restored before hardware
- Pressure and flow verified first
- No manual restart needed
The automatic restart sequence
- Power is restored — the system comes back after a grid outage.
- Water circulation restarts first — pumps re-establish flow through the loops before any hardware is energized.
- Pressure and flow are verified — the sequence waits until both meet specification.
- Mining units come online — hardware is brought back safely, in order, without manual intervention.
Why the order matters
- Cooling before compute. Energizing racks before flow is confirmed risks an immediate thermal event.
- Interlocks enforce the sequence. The PLC will not advance until conditions are met.
- Recovery without a site visit. The sequence removes the need for an operator to drive to the container.